Information about roadworks in the Wellington-Kāpiti region
Well maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thanks for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for the coming week. We’ll keep you posted on future works and have regular updates on local radio stations.
State Highway 1
Waikanae Bridge
Monday to Thursday night. Traffic controlled by stop/go.
Pukerua Bay
Mill and fillsWednesday night. Traffic controlled by stop/go.
Location | Type of work | Start date |
---|---|---|
Newlands onramp | Footpath replacement | Sunday and Monday night |
Thorndon overbridge | Bridge joint maintenance | Sunday |
Vivian Street to Victoria Street | Traffic signal maintenance | Sunday to Thursday |
State Highway 2
Please allow extra time for your journey if you are travelling through the Wairarapa over the coming weeks, as there are multiple work sites. Keep to the temporary speed limit for your safety and the safety of our work crews. Allow plenty of room between you and the vehicle in front to minimize the risk of damage to your windscreen and paintwork.
Location | Type of work | Start date |
---|---|---|
Ngauranga to Petone | Barrier replacement | Sunday 22 May to Thursday |
| Channel clearing | Tuesday and Wednesday. Stop / go |
State Highway 58
Location | Type of work | Start date |
---|---|---|
Haywards Passing Lanes | Tree maintenance | Monday and Tuesday |
NOTE: If bad weather should strike, work will be postponed to the next suitable night.
NOTE: If bad weather should strike, work will be postponed to the next suitable night.