Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 3073

Wellington region maintenance programme

$
0
0

Information about roadworks in the Wellington-Kāpiti region

Well maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thanks for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for the coming week from 11 September 20164 September 2016 .  We’ll keep you posted on future works and have regular updates on local radio stations.

State Highway 1

Location

Type of work

Start date

Paraparaumu
Daytime lane closure in the southbound direction for treee felling south of the Paraparaumu traffic lights.

Tree felling

Sunday

Mana Esplanade
Major resurfacing works starting from the Plimmerton roundabout to the Z service station for the next few weeks. Traffic will be controlled by stop/go.  For further information .  

Resurfacing

Sunday to Thursday nights

Coast Road
On Sunday night southbound traffic will be controlled by stop/go for drainage repairs and on Wendesday night northbound for guardrail and footpath repairs.  

Drainage clearing

Sunday night

Terrace Tunnel and Mt Victoria tunnels
Monthly routine maintenance will require the tunnel to be closed overnight.  Please follow the signed detour.

Routine maintenance

Monday / Tuesday nights respectively

Tawa Interchange Underpass
Traffic will be controlled by stop / go to enable vegetation removal work.

Vegetation removal

Thursday night

Johnsonville southbound offramp
The southbound offramp from SH1 heading into Johnsonville will be closed and detour in place.

Lighting pole replacement work

Wednesday and Thursday night

Kuku Bridge
Traffic will be controlled by stop / go to enable crews to work.

Dig outs

Thursday night

Te Horo (Old Red Shed café)
Contraflow and temporary speed limit for pavement / road surface repairs.

Pavement repairs

Monday to Friday

Paekakariki
Traffic controlled by stop/go for barrier repairs.

Barrier repairs

Tuesday and Wednesday nights

State Highway 2

Location

Type of work

Start date

Rimutaka Hill Road Bridge 6
Traffic will be controlled by stop/go for guardrail repairs.

Guardrail repairs

Wednesday and Thursday

Rimutaka Hill Road
Traffic controlled by stop/go to allow crews to repair an electronic sign. 

Repair Electronic Warning Sign

Monday and Tuesday

Te Marua to Kaitoke
Crews are clearing slips. Traffic will be controlled by stop/go while the work is underway.

Slip clearing

Tuesday

State Highway 58

Location

Type of work

Start date

Haywards
Lane/contraflows near Mt Cecil for bank hydroseeding.

Hydroseeding of bank

Monday and Tuesday

NOTE: If bad weather should strike, work will be postponed to the next suitable night.

Location

Type of work

Start date

Ōtaki / Peka Peka
Daytime road layout changes and 30kph temporary speed limit for shoulder widening.

Shoulder widening

Monday and Tuesday

Mana Esplanade
Major resurfacing works starting from the Plimmerton roundabout to the Z service station for the next few weeks. Traffic will be controlled by stop/go.  For further information .  

Resurfacing

Sunday to Thursday nights

Mana night works

Coast Road
Resurfacing.  Traffic will be controlled by stop/go.

Resurfacing

Monday and Tuesday nights

Te Horo – Old Red Shed café vicinity
Temporary speed limit 30kph for resurfacing works.

Resurfacing

Monday to Friday

Ngauranga Gorge
Lane closures to enable crews to repair the high friction road surface at the top of the Ngauranga Gorge.

Maintenance

Monday and Tuesday night

Waikanae - Ōtaki
Traffic controlled by stop/go for ‘mill and fill’ repairs.

Road surface repairs

Wednesday night

State Highway 2

Location

Type of work

Start date

Mt Bruce
Traffic will be controlled by stop/go to allow crews to undertake dig out work on the highway.

Dig outs

Friday

Rimutaka Hill Road
Traffic controlled by stop/go to allow crews to clear channels and underslip repair work.

Underslip and channel maintenance

Monday to Friday

Greytown and Brown Owl
Crews are resurfacing ‘mill and fills’.  Traffic will be controlled by stop/go while the work is underway.

Mill and fills

Thursday night

State Highway 58

Location

Type of work

Start date

East of Spinnaker Drive
Traffic will be controlled by stop/go while crews repair barriers.

Barrier repairs

Tuesday night

 

NOTE: If bad weather should strike, work will be postponed to the next suitable night.


Viewing all articles
Browse latest Browse all 3073

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>