Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 3073

Wellington region maintenance programme

$
0
0

Information about roadworks in the Wellington-Kāpiti region

Well maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thanks for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for the coming week from 18 September 2016 .  We’ll keep you posted on future works and have regular updates on local radio stations.

State Highway 1

Location

Type of work

Start date

Peka Peka
Traffic controlled by stop/go to allow crews to work on the Peka Peka tie-in for the new expressway.

Expressway roadworks

Sunday to Thursday nights

Mana Esplanade
Major resurfacing works at night along Mana Esplanade. Traffic will be controlled by stop/go.  For further information:

Resurfacing

Sunday to Thursday nights

Coast Road
Traffic will be controlled by stop/go for to allow crews to resurface sections of the road (mill and fillss).

Resurfacing

Sunday and Monday nights

Mt Victoria tunnel
Closed Sunday night.   Please follow the signed detour.

Routine maintenance

Sunday night

Pukerua Bay
Traffic will be controlled by stop / go to enable UFB to be installed.

UFB installation

Tuesday to Thursday nights

Ngauranga Gorge
Lane closures to allow crews to repair the high friction surface at the top of the Gorge.

Resurfacing

Monday and Tuesday night

Te Horo Beach Road Intersection
Lane layout changes and a temporary speed limit for shoulder widening works.

Shoulder widening

Monday and Tuesday daytime

Churton Park
Lane closures for road surface repairs (mill and fills).

Mill and fill repairs

Tuesday night

Paekakariki Bridge
Traffic will be controlled by stop/go to allow crews to work on bridge joints.

Bridge joint repairs

Tuesday and Wednesday nights

Paraparaumu south of Kapiti lights
Lane closures during the day for dig outs.

Maintenance

Friday daytime

North of Waikanae
Traffic will be controlled by stop/go for resurfacing works (mill and fills).

Resurfacing

Thursday night

Otaki
Traffic will be controlled by stop/go for resurfacing works (mill and fills).

Resurfacing

Thursday night

Otaihanga and Waikanae Straights
Crews a rerepairing guardrails so a temporary speed limit will be in place.

Barrier repairs

Tuesday daytime

State Highway 2

Location

Type of work

Start date

Rimutaka Hill Road
Numerous work sites on the Rimutaka Hill Road all  week to enable work for guardrail and underslip repairs. Traffic will be controlled by stop/go for

Guardrail, underslip repairs

All week during the day

Rimutaka Hill Road
Traffic controlled by stop/go to allow crews to repair an electronic sign. 

Repair Electronic Warning Sign

Tuesday

State Highway 58

LocationType of workStart date

Haywards
Ongoing work by Lanes Flat for Transmission Gully.

 

Monday to Friday

NOTE: If bad weather should strike, work will be postponed to the next suitable night.


Viewing all articles
Browse latest Browse all 3073

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>