Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 3073

Wellington region maintenance programme

$
0
0

Information about roadworks in the Wellington-Kāpiti region.

Well maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thanks for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for the coming week from 25 September 2016 .  We’ll keep you posted on future works and have regular updates on local radio stations.

State Highway 1

Terrace, Mt Victoria and Arras tunnels
Closed Monday, Tuesday and Wednesday nights respectively for tunnel maintenance work. Please follow the signed detour.  

Routine maintenance

Monday/Tuesday/Wednesday nights 

Hawkestone onramp
Ramp closed for repair of overheight detector equipment. 

UFB installation 

Monday night

Waikanae (Elizabeth Street)
Lane closure to repair traffic lights.

Traffic light repairs Tuesday and Wednesday night

Otaihanga
Lane closure for power pole replacement. 

Power pole replacement Friday daytime

State Highway 2

Location

Type of work

Start date

Rimutaka Hill Road 
Traffic will be controlled by stop/go for guardrail  and underslip repairs.

Guardrail and underslip repairs

Monday to Friday

Rimutaka Hill Road
Traffic controlled by stop/go to allow crews to repair an electronic sign.    

Repair Electronic Warning Sign

Sunday to Thursday nights

Te Marua 
Crews are replacing a sump and a 30km/h speed limit will be in place while crews are working. 

Sump replacement

Monday to Friday

Kiriwhakapapa Road
Traffic will be controlled by stop/go while resurfacing work is underway.

Resurfacing

Monday

Ruamahanga River Bridge
Traffic will be controlled by stop/go while resurfacing work is underway.

Resurfacing

Monday - Tuesday

Greytown (by fruitstalls)
Lane changes to allow crews to do tree maintenance work between Portland Road and 485 High Street.

Tree maintenanceWednesday

Carterton
Lane changes to allow crews to do tree maintenance work by the Big Apple.

Tree maintenanceWednesday

State Highway 58

Location

Type of work

Start date

Haywards
Ongoing work by Lanes Flat for Transmission Gully.

 

Monday to Friday

NOTE: If bad weather should strike, work will be postponed to the next suitable night.

Location

Type of work

Start date

Peka Peka Churton Park to Tawa – S-bends
Traffic controlled by stop/go to allow crews to work on the Peka Peka tie-in for the new expresswayto clear slips.

Expressway roadworksTree removal

SundayMonday to Thursday nights

Tuesday days
5am-1pm

Mana Esplanade
Major resurfacing worksWeather permitting, Monday and Tuesday nights at night along Mana Esplanade.Plimmerton applying a 30mm top surface from Pope St to near the Plimmerton roundabout Wednesday and Thursday at south Mana Esplanade excavating and filling with dense asphalt to repair the road.

Resurfacing

Sunday to Thursday nights

North of Pukerua Bay and Coast Road
Asphalt repairs. Traffic will be controlled by stop/go.  

ResurfacingRepairs

SundayMonday to ThursdayTuesday nights

North of Paekakariki township
Coast Road
Traffic will be controlled by stop/go for to allow crews to resurface sections of the road (mill and fillss). 

Asphalt repairs. Traffic will be controlled by stop/go.  

ResurfacingRepairs

Wednesday night

Raumati Straights - Mackays to Peka Peka Expressway
Works upgrading highway shoulder and installing guardrail.

Expressway works

Monday to Friday days

Peka Peka - Mackays to Peka Peka Expressway
Works upgrading highway shoulder and installing guardrail.

Expressway worksSunday -to Thursday nights

Otaki
Asphalt repairs. Traffic will be controlled by stop/go.  

RepairsWednesday night

NOTE: If bad weather should strike, work will be postponed to the next suitable night.


Viewing all articles
Browse latest Browse all 3073

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>