Information about roadworks in the Wairarapa region
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wairarapa region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for the coming week from Sunday 1811 December – Saturday 2417 December 2016 . We’ll keep you posted on future works and have regular updates on local radio stations.
NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.
State Highway 2
Location
Location
Start date
Start date
Tourist road arrows – south
Stop/go traffic control to paint tactile ‘dot matrix’ arrows guiding tourists to drive on the left
Rimutaka Hill
Stop/go traffic control at several sites
Expect speed restrictions in following days.
Sunday 18 th– Tuesday 20 th
7pm-5.30am
Monday 12th – Friday 16th
8am-4pm
Featherston / south of SH53 intersection
Stop/go traffic control for chipsealing work
Expect speed restrictions in following days.
Chipsealing
Tuesday 13 th
8am-4pm
South of Andersons Line, Clareville
Stop/go traffic control for chipsealing work
Expect speed restrictions in following days.
Chipsealing
Wednesday 14 th
8am-4pm
Type of work |
Tourist safety
|
State Highway 53
Location | Type of work | Start date |
No planned roadworks along SH53 this week | - | - |
NOTE: If bad weather should strike, work will be postponed to the next suitable night.