Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 3073

State Highway 6 Kawarau Falls Bridge time night works

$
0
0

These bridge closures are necessary so a retaining wall on the north side for the new two-lane bridge abutment can be built.

Stop/ Go traffic management will be in place.

Work starts on Sunday, 26 March, at 7 pm and is scheduled to end on Friday 31 March.

  • Each night shift is from 7 pm to 6 am.
  • Between 7 pm and 11 pm drivers should allow for 10 minute delays.
  • Between 11pm and 6 am the road will open to traffic for 10 minutes every hour on the hour.
  • Between 7 pm and 6 am over-dimension vehicles cannot use the bridge.

The Transport Agency thanks all residents for being patient while this key piece of work is carried out. There may be some noise and vibrations.

If people can plan their night travel to coincide with the ten-minute hourly openings at the bridge between 11pm and 6am, they can minimise disruptions to their travel plans.


Viewing all articles
Browse latest Browse all 3073

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>