Information about roadworks in the Wellington and Kāpiti regions
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for Friday 17Sunday 12 March - Saturday 2518 March 2017 as follows. We’ll keep you posted on future works and have regular updates on local radio stations.
NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.
Friday 17Sunday 12 March - Saturday 2518 March 2017
Wellington - Kāpiti
State Highway 1
Ngauranga Gorge, before Johnsonville northbound off-ramp
Northbound lane closed for road surface repairs
Paving
Tuesday 21 st
7pm-5.30am
1km south of Churton Park
Southbound lane closed for road surface repairs
Paving
Tuesday 21 st
7pm-5.30am
Porirua, Mungavin southbound off-ramp
Detour via Titahi Bay southbound off-ramp while Mungavin off-ramp closed to install lampposts
Lighting
Tuesday 21 st– Wednesday 22 nd
7pm-5.30am
Mana Esplanade – Plimmerton
a) Monday, south of Pascoe Avenue intersection, southbound lane closed to clear sump
b) Tuesday, stop/go to install traffic sensors at Acheron intersection
c) Thursday, southbound lane closed to install broadband cable for property near Steyne Ave intersection
Drainage, traffic lights, telecoms
a) Monday 20 th 9.30am-3.30pm
b) Tuesday 21 st 7pm-5.30am
c) Thursday 23 rd 9am-3pm
Plimmerton Weigh Station
Northbound lane closed for road surface repairs
Paving
Tuesday 21 st
7pm-5.30am
Pukerua Bay, rail overbridge to the shops
Stop/go traffic control for road surface repairs
Paving
Sunday 19 th
Midnight – 5.30am
Follows work done at Manakau that night
Coast Road, north of Pukerua Bay
Stop/go traffic control to replace damaged guardrail
Guardrail
Monday 20 th– Thursday 23 rd
8pm-5.30am
Paekakarirki, Sang Sue corner south of Mackays Crossing
Southbound stop/go traffic control to extend project barriers
Transmission Gully Project
Thursday 23 rd
7pm-5.30am
Raumati Straight
Lane closures for work on approach to expressway
Mackays-Peka Peka Expressway
Sunday 19 th– Friday 24 th
Various times day and night
Kapiti Expressway
Lane closed to repair damaged guardrail
Guardrail
Friday 24 th
8am-3.30pm
Peka Peka passing lane
Northbound lane closed to remove passing lane and protect washed-out culvert. Link to information flyer
Passing lane closure
Sunday 12 th– Saturday 18 th
24 hours
North of Peka Peka passing lane to Te Hapua Road
Stop/go traffic management to repair drain and road
Paving and Drainage
Sunday 19 th– Thursday 23 rd
7pm-5.30am
Otaki Bridge area, 200m stretch of highway north of Riverbank Road
Stop/go traffic control
a) Monday to make repairs ahead of resurfacing
b) Thursday to resurface the road with asphalt
Paving
Monday 20 th
7pm-5.30am
Thursday 23 rd
7pm-5.30am
Manakau south
Lane closed for various road surface repairs through 1km section from South Manakau Road to Gleeson Road. This work follows other repairs being done elsewhere earlier in the night
Paving
Sunday 19 th
7pm - Midnight
Manakau threshold
Lane closed to replace threshold sign
Signs
Monday 20 th
7am-4pm
Ohau south
Lane closed to raise shoulder heights to road level
Maintenance
Friday 24 th
7am – 3.30pm
Tourist arrows
Stop/go traffic control to install tactile ‘dot matrix’ directional arrows indicating left-side driving – various sites. http://www.nzta.govt.nz/media-releases/new-arrows-point-drivers-in-the-right-direction/
Tourist safety
Sunday 12 th–Thursday 16 th
7pm-5.30am
Location |
Type of work |
Start date |
Cobham Drive, en route to Wellington Airport Lane closed to reinstall | Wellington City Council | Tuesday 21 9am-3pm |
Mt
| Wellington City Council and telecoms | Sunday 12 th– Thursday 16 th 7pm-5.30am |
The Terrace Tunnel
Detour via Newtown or Wellington Harbour bays | Tunnel maintenance |
7pm-5.30am (May open earlier)
|
Kent Southbound lane closed for asphalt resurfacing | Paving | Wednesday 22 nd 7.30pm-5.30am |
Vivian Street-Tory Street intersection Lane closed to install CCTV chamber at traffic lights | Traffic safety | Sunday 19 th– Tuesday 21 st 7pm-5.30am |
Thorndon overbridge Lane closed | Bridge | Sunday 19 th– Thursday 23 rd
7pm-5.30am |
Seawall, Urban motorway Southbound lane | Seawall | Sunday 19th 7pm-5.30am |
Centennial Highway, Glover Street, southbound off the motorway Southbound lane closed for bus stop maintenance and footpath repairs | Maintenance | Sunday 19 7pm-5.30am
|
Westchester Drive Overbridge,between Southbound lane closed for asphalt resurfacing Monday | Paving | Sunday 7pm-5.30am
Monday 20 th 10pm ramps closed |
Tawa southbound off-ramp
| Transmission Gully Project | Tuesday 14 th– Wednesday 16 th 7pm-5.30am |
Mana Esplanade, Acheron Road Lane closed to replace lamppost | Lighting | Sunday 19
7pm-5.30am |
Porirua, northbound off-ramp
| Paving
| Thursday 16 th 7pm-5.30am |
Paraparaumu, near Coastlands Northbound lane closed to Whitford Brown Drive | Maintenance | Monday 13 th– Wednesday 15 th
|
Peka Peka passing lane Lane | Lighting | Sunday 12 th– Saturday 18 th 24 hours |
Marycrest, Te Horo Southbound lane closed to bring roadside shoulders up to level | Maintenance | Thursday 16 th 8am-4pm |
Manakau, near railway overbridge Lane closed for driveway repairs | Paving | Monday 20 7pm-5.30am
|
State Highway 2
Normandale to Melling
Lane closed for shoulder and culvert maintenance
Maintenance
Wednesday 22 nd
7pm-5.30am
Rimutaka Hill Road – Wellington motorway
Stop/go southbound traffic control for culvert inspections
Inspections
Monday 12 th – Thursday 16 th
7pm-5.30am
Tourist arrows
Stop/go traffic control to install tactile ‘dot matrix’ directional arrows indicating left-side driving
Tourist safety
Sunday 12 th–Thursday 16 th
7pm-5.30am
Location |
Type of work |
Start date |
SH2-Ngauranga Gorge northbound intersection Detour along urban motorway to Aotea Quay off-ramp and return via Aotea Quay on-ramp. Intersection | Traffic lights | Monday 20
10pm-5.30am |
SH2/58 Haywards Hill interchange Stay alert for queues, please focus on driving rather than slowing down to view project activities | Interchange project | Monday 20 9am-4pm |
Birchville, Upper Hutt, Stop/go traffic control for chipsealing Friday night – 400m
Speed restrictions (30kph or 50kph) at all other times. | Road reconstruction | Friday 17 th Chipsealing 6.30pm
Saturday 18 th– All day
|
State Highway 58
State Highway 58
Paremata Road, near Oak Avenue
Stop/go traffic control to install broadband fibre connection
Telecoms
Tuesday 21 st
7pm-5.30am
Location |
Type of work |
Start date |
Lane closed for road repair | Road repair | Tuesday 21 7pm-5.30am |