Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 3073

Wairarapa maintenance programme

$
0
0

Information about roadworks in the Wairarapa region

Well-maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wairarapa region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for Sunday 2 April - Saturday 8 April . We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night. 

HEAVY RAIN TRAFFIC ADVICEADVICE: Thursday 6 April 

State Highway 2

Clareville : Caution needed betweenneeded. Temporary 70kph speed limit on slippery surface between Chester Road and Hughes Line - slippery when wet.Line.

Te Marua: Temporary traffic management and a reduced speed limit is in place south of the Te Marua golf course while urgent stabilisation work is carried out on the riverbank. The reduced speed limit applies at all times in this area until further notice.

State Highway  53

Waihenga Bridge near Martinborough closed due to the risk of flooding. Detours available north and south.

All state highways

Please take care and drive to the  conditions.

 

Sunday 2 April - Saturday 8 April

State Highway 2

                               

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 2 nd

  
  

Mon 3 rd

  
  

Tue 4 th

  
  

Wed 5 th

  
  

Thu 6 th

  
  

Fri 7 th

  
  

Sat 8 th

  

POSTPONED

Rimutaka Hill Road

Stop/go traffic control   for surface repairs where asphalting works are planned – various sites

Link to map of works

Paving

8am-4pm

 

 

#

#

#

 

#

 

Carterton

Altered lane layout for   power line maintenance

Powerco

8am-3.30pm

 

#

 

 

 

 

 

Clareville

Altered lane layout for   works to level road shoulders

Road shoulder

8am-4pm

 

 

 

#

 

 

 

Mt Bruce

Stop/go northbound traffic control for works to level road shoulders

Road shoulder

8am-4pm

 

 

 

 

#

 

 

State Highway 53

                        

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 2 nd

  
  

Mon 3 rd 

  
  

Tue 4 th

  
  

Wed 5 th

  
  

Thu 6 th

  
  

Fri 7 th

  
  

Sat 8 th

  

No major works this week

 

 

 

 

 

 

 

 

 


Viewing all articles
Browse latest Browse all 3073

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>