Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 3073

Wairarapa maintenance programme

$
0
0

Information about roadworks in the Wairarapa region

Well-maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wairarapa region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for Sunday 9 April - Saturday 15 April . We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night. 

Sunday 9 April - Saturday 15 April

Easter weekend: Please be patient and allow extra time for your journeys.EASTER WEEKEND: PLEASE BE PATIENT AND ALLOW EXTRA TIME FOR YOUR JOURNEYS

Met Service severe wind warning for Thursday night, Friday morning: Please consider delaying your journey until this cyclone has passed through.

 

State Highway 2

                              

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 9 th

  
  

Mon 10 th

  
  

Tue 11 th

  
  

Wed 12 th

  
  

Thu 13 th

  
  

Fri 14 th

  
  

Sat 15 th

  

Rimutaka Hill Road

Stop/go traffic control for surface repairs where asphalting works are planned – various sites

Link to map

Paving

8am-4pm

 

 

#

#

#

 

 

 

Carterton north, near Matarawa Road

Stop/go northbound traffic control for works to level road shoulders

Road shoulder

7am-Midday

 

 

 

#

 

 

 

                           

State Highway 53

                            

 

Location  

  

Type of work

  
  

Hours

  
  

Sun 9 th 

  
  

Mon 10 th  

  
  

Tue 11 th

  
  

Wed 12 th

  
  

Thu 13 th

  
  

Fri 14 th

  
  

Sat 15 th

  

Near Bidwills Cutting Road

Stop/go traffic control for clearing roadside channels

Drainage

7am-5pm

 

 

#

 

 

 

 

                      

 


Viewing all articles
Browse latest Browse all 3073

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>