Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 3073

Nelson and Tasman maintenance programme

$
0
0

Well maintained roads are an important part of keeping people safe. safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. inconvenient. Thanks for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits. limits. If you’re driving around the Nelson and Tasman regions, roadworks on the state highway network may affect your travel plansplans.

Below is a quick outline of the major works planned for the coming week from 81 May 20172017.

State Highway 6

Rai Saddle
Traffic to be controlled by stop/go while crews carry out shoulder widening

 

Shoulder Widening

 

Monday - Friday

Whangamoa
Traffic to be controlled by stop/go while milling is conducted

 

Surface Renewals

 

Monday - Friday

Whangamoa
Traffic to be controlled by stop/go while crews carry out asphalt resurfacing

 

Surface Renewals

 

Monday – Friday

Whangamoa
Traffic will be controlled by stop/go while crews carry out Guardrail installation.

 

Guardrail Installation

 

Monday - Friday

Richmond Deviation
Speed restriction and shoulder closures while crews carry out shoulder maintenance

 

High shoulder removal

 

Wednesday - Friday

Hope Saddle
Traffic to be controlled by stop/go while crews carry out guardrail installation

 

Guardrail Installation

 

Monday - Friday

State Highway 60

Location

Type of Work

Start Date

Motueka
Shoulder closures while crews carry out subsoil installation

 

Drainage works

 

Wednesday - Friday

 

NOTE: If bad weather should strike, work will be postponed to the next suitable day / night

Whangamoa
Traffic to be controlled by stop/go while milling is conducted

 

Surface Renewals

 

Tuesday-Friday

Whangamoa
Traffic to be controlled by stop/go while crews carry out asphalt resurfacing

 

Surface Renewals

 

Wednesday – Friday

Whakatu Drive
Traffic will be controlled by stop/go while crews carry out surfacing repairs.

 

Surface Repairs

 

Monday Night

Brightwater
Traffic to be controlled by stop/go while crews carry out guardrail repairs 

 

Guardrail Repairs

 

Monday-Tuesday

Spooners Saddle
Trafffic to be controlled by stop/go while crews clear debris catch fences

Debris Fence Clearing

Wednesday-Friday

Korere Straight
Traffic to be controlled by stop/go while crews carry out surfacing repairs

Surface Repairs

Wednesday - Friday

NOTE: If bad weather should strike, work will be postponed to the next suitable day / night

Location

Type of Work

Start Date


Viewing all articles
Browse latest Browse all 3073

Trending Articles