Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 3073

Traffic notices

$
0
0

Traffic notice for the week 2619 - 25 May - 1 June 2017

Traffic notices provide a brief overview of likely traffic disruptions for the following week. Full closures are also advertised in the Weekend Herald. Traffic notices are complemented by monthly construction updates and quarterly newsletters.

   

ALREADY IN PLACE

  • Narrowed lanes and 80 km/h speed limit northbound on the motorway between the Papakura Interchange and Hill Road.
  • Narrowed lanes and 80 km/h speed limit southbound on the motorway between Orams Road and the Papakura Interchange.
  • Full closure of Orams Road Bridge to all traffic and pedestrians.
  • Narrowed lanes and 50 km/h speed limit both directions on Great South Road at Takanini Interchange, between the northbound off-ramp and the southbound on-ramp.

 

TRAFFIC NEXT WEEK

 Northbound

  • Sunday 2821 May - Night closure of the fullone lanenorthboundmotorway from the Papakura Interchange through to the Takanini Interchange. This includes closure of the Papakura northbound on-ramps.Orams Road Bridge
  • Monday 29 May - Tuesday 30 May -Monday 22 May - Thursday 25 May - Night closure of two lanes northboundnorthbound from the Takanini Interchange to Orams Road Bridge.
  • Tuesday 30Thursday 25 May - Night closure of the full motorway northboundfrom from the TakaniniPapakura Interchange to Hill Road.the Takanini Interchange. This includes closure of the Papakura northbound on-ramp at Takanini.on-ramps.
  • Thursday 1 June - Night closure of one lane northbound from the Papakura Interchange to the Takanini Interchange.

 

Southbound 

 

Southbound

 

  • Sunday 2821 May - Tuesday 30– Thursday 25 May - Night closure of the full motorway southbound from the Manakau Interchange to the Takanini Interchange. ThisInterchange.This includes closure of the Redoubt Road on-ramp, Lambie Drive eastbound on-ramp, and SH20-1 Link.
  • Sunday 28Thursday 25 May - Night closure of one lanelane southbound from the Takanini Interchange to the Papakura Interchange.
  • Wednesday 31 May - Night closure of the full motorway southbound between the Takanini off-ramp and the Takanini on-ramp.
  • Thursday 1 June - Night closure of the full motorway southbound from the Takanini Interchange to Papakura Interchange. This includes closure of the southbound on-ramp at Takanini.


 

 

UPCOMING WORKS (dates may be subject to change)

 

  • Monday 5 June - Night closure of the full motorway southbound from the Takanini Interchange to Papakura Interchange. This includes closure of the on-ramp at Takanini.

 

 

 Night work on the motorway next week involves continuing the demolition of the Orams Road Bridge, asphalting in the median at the Pahurehure Inlet, and Slipforming the new median barrier under Alfriston Road Bridge. If it rains or ground conditions are too wet, work will be postponed until the next available dry night.

 To construct an additional fourth southbound lane from SH20 to Hill Road, the eastern span of Orams Road Bridge will be widened.   Orams Road Bridge will be temporarily closed to all pedestrians and traffic while this work takes place from April 22 to October 2017.

Night closures are typically from 9pm at night to 5am in the morning. Work during the night will allow our crews to operate equipment safely while adjacent to the existing traffic lanes. Work in the shoulder and median work zones will continue during the daytime next week, but this will not affect traffic movements.

With the lanes narrowed, there is less time to react to other vehicles and it is important that motorists keep to the 80 km/h speed limit past our work areas. There will be ongoing truck and project vehicle movements accessing the shoulder and median work sites. Keeping both motorists and our team members safe as possible is imperative and we need everyone's help to do this.

As always, we will be doing our best to minimise effects of these works on the public as much as we can.

We thank you for your patience as we work to improve journey reliability and safety along the Southern Corridor.

If you have any questions or queries, please contact our team on free phone 0508 NZTA SCI (0508 698 2724) or email us at southerncorridor@nzta.govt.nz . Also feel free to visit us at the Project Office located at 8 Great South Road, Takanini.

Detour maps

Southbound Takanini Papakura Detour Map

Southbound Manukau Takanini Detour Map

Northbound Takanini Manukau Detour Map

Northbound Papakura Takanini Detour Map

Local Roads 

  • 9:00pm – 5:00am Monday 22 May - Night closure of two lanes westbound on Great South Road, under the Takanini Interchange.

 

UPCOMING WORKS (dates may be subject to change) 

  • Sunday 28 May – Tuesday 30 May - Night closure of the full motorway southbound from the Manakau Interchange to the Takanini Interchange. This includes closure of the Redoubt Road on-ramp, Lambie Drive eastbound on-ramp, and SH20-1 Link.

 

 Night work on the motorway next week involves continuing the demolition of the Orams Road Bridge, asphalting in the median at the Pahurehure Inlet, and Slipforming the new median barrier under Alfriston Road Bridge. If it rains or ground conditions are too wet, work will be postponed until the next available dry night.

 To construct an additional fourth southbound lane from SH20 to Hill Road, the eastern span of Orams Road Bridge will be widened.   Orams Road Bridge will be temporarily closed to all pedestrians and traffic while this work takes place from April 22 to October 2017.

Night closures are typically from 9pm at night to 5am in the morning. Work during the night will allow our crews to operate equipment safely while adjacent to the existing traffic lanes. Work in the shoulder and median work zones will continue during the daytime next week, but this will not affect traffic movements.

With the lanes narrowed, there is less time to react to other vehicles and it is important that motorists keep to the 80 km/h speed limit past our work areas. There will be ongoing truck and project vehicle movements accessing the shoulder and median work sites. Keeping both motorists and our team members safe as possible is imperative and we need everyone's help to do this.

As always, we will be doing our best to minimise effects of these works on the public as much as we can.

We thank you for your patience as we work to improve journey reliability and safety along the Southern Corridor.

If you have any questions or queries, please contact our team on free phone 0508 NZTA SCI (0508 698 2724) or email us at southerncorridor@nzta.govt.nz . Also feel free to visit us at the Project Office located at 8 Great South Road, Takanini.

Detour maps

Southbound Takanini Papakura Detour Map

Southbound Manukau Takanini Detour Map

Northbound Takanini Manukau Detour Map

Northbound Papakura Takanini Detour Map


Viewing all articles
Browse latest Browse all 3073

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>