Information about roadworks in the Wellington and Kāpiti regions
Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for Sunday 4 June 28 May- Saturday 10Saturday 3 June 2017 as follows. We’ll keep you posted on future works and have regular updates on local radio stations.
NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.
TUNNELS, MONTHLY MAINTENANCE:Link to 2017 calendar
Queen’s Birthday Weekend 3-5 June
Passing lane closures
- Friday, Saturday: Te Horo to Otaki northbound passing lane closed 10am-8pm
- Monday: Passing lane south from Forest Lakes to Otaki roundabout closed 10am-8pm
Saturday 3 June
South of Silverstream traffic lights: Southbound lane closed to install sign 7am-4pm
Sunday 4 June28 May - Saturday 10Saturday 3 June 2017
State Highway 1
Location |
Type of work |
Hours |
Sun 4 thh |
Mon 5 th |
Tue 6 th |
Wed 7 th |
Thu 8 th |
Fri 9 th |
Sat 10 th |
Cobham Drive/Evans Bay Parade intersection Caution required for traffic signals upgrade | Traffic signals | Monday 8pm-5.30am
Tuesday- Thursday 7pm-5.30am |
| √ | √ | √ | √ |
|
|
Vivian Street to Basin Reserve Stop/go traffic control to paint road markings | Road marking | 7pm-5.30am |
| √ | √ | √ | √ |
|
|
Kent Terrace Bus lane closed to monitor wastewater and install alarm | Wastewater | 10pm-5.30am |
|
|
| √ | √ |
|
|
Tawa, northbound on-ramp Detour via Churton Park off and on-ramps to head north on SH1 while Tawa northbound on-ramp closed to replace lampposts | Lighting | Monday 10pm-5.30am Tuesday-Thursday 9pm-5.30am |
| √ | √ | √ | √ |
|
|
Linden, south of Porirua Lane closed for centre median construction | Transmission Gully project | 7pm-5.30am |
| √ | √ | √ | √ |
|
|
Paremata Bridge Southbound lane closed for bridge works | Bridge works | 9.30am-3.30pm |
|
| √ | √ | √ | √ |
|
Mana Esplanade, south of Pascoe Avenue Southbound lane closed to haul broadband cable through existing manholes | Telecoms | 9.30am-3pm |
|
|
|
| √ | √ |
|
Mana Esplanade Lane closed for road marking | Road marking | 7pm-5.30am |
| √ | √ | √ | √ |
|
|
Coast Road Stop/go northbound traffic control for footpath repairs | Footpath repair | 7pm-5.30am |
|
|
| √ | √ |
|
|
Kapiti Expressway – Raumati Straight and Peka Peka Expect traffic controls at various times for finishing works | Expressway project | Various times day and night |
| √ | √ | √ | √ | √ | √ |
Old SH1, Paraparaumu to Levin Lane closed to maintain power poles – various locations | Electra | 8.30am-4.30pm |
|
| √ | √ | √ | √ |
|
Waikanae to Levin Stop/go at various locations for road marking | Road marking | 7pm-5.30am |
| √ | √ | √ | √ |
|
|
Forest Lakes to Otaki passing lane Southbound lane closed for holiday traffic control | Passing lane closure | 10am-8pm |
| √ |
|
|
|
|
|
Location |
Type of work |
Hours |
Sun 28 th |
Mon 29 th |
Tue 30 th |
Wed 31 st |
Thu 1 st |
Fri 2 nd
|
Sat 3 rd |
Cobham Drive/Evans Bay Parade intersection Caution required for work on pedestrian islands, part of traffic signals upgrade | Traffic signals | 9am-3pm |
| √ | √ | √ | √ | √ |
|
Vivian Street to Basin Reserve Stop/go traffic control to repaint road markings | Road marking | 7pm-5.30am | √ | √ | √ | √ | √ |
|
|
Karo Drive, from south of Victoria Street to Willis Street intersection POSTPONED TO TUESDAY Lane closed to apply skid-resistant surface | Paving | 7pm-5.30am |
|
| √
|
|
|
|
|
The Terrace Tunnel closed Detours signposted via other motorway off and on-ramps while tunnel closed for maintenance | Tunnel | 9pm- 5.30am 7pm traffic control set up starts | √ |
|
|
|
|
|
|
Tawa, southbound on-ramp Lane closed to replace lampposts | Lighting | 7pm-5.30am | √ | √ | √ | √ | √ |
|
|
Linden, south of Porirua Lane closed for centre median construction | Transmission Gully project | 7pm-5.30am | √ | √ | √ | √ | √ |
|
|
Paremata roundabout, on approach from the south Northbound lane closed to repair threshold sign | Signs | 9am-3pm |
|
|
| √ |
|
|
|
Plimmerton Roundabout, on approach from the north Southbound lane closed to apply skid-resistant surface | Paving | 7pm-5.30am |
|
| √ |
|
|
|
|
Coast Road Stop/go northbound traffic control for footpath repairs | Footpath repair | 7pm-5.30am |
| √ |
|
|
|
|
|
Kapiti Expressway – Raumati Straight and Peka Peka Expect traffic controls at various times for finishing works | Expressway project | Various times day and night |
| √ | √ | √ | √ | √ |
|
Old SH1, Paraparaumu to Levin Lane closed to maintain power poles – various locations | Electra | 8.30am-4.30pm |
| √ | √ | √ | √ | √ |
|
Kuku, south of Kuku East Road Stop/go traffic control for road repair | Road repairs | 7.30pm-5.30am |
|
|
| √ |
|
|
|
State Highway 2
√
√
√
√
Te Marua, south of golf course
Caution required for trucks accessing/exiting riverbank stabilisation works
Riverbank works
8.30am- 3.30pm
√
√
√
√
√
Location |
Type of work |
Hours |
Sun 4 |
Mon 5 |
Tue 6 |
Wed 7 |
Thu 8 |
Fri 9
|
Sat 10 |
Horokiwi Lane closed to | Speed camera | 7pm-5.30am |
|
| √ | √ | |
|
|
Petone, after the overbridge Northbound lane closed for road repairs | Paving | 9.30pm-5.30am | | √ | | | | |
|
Owen Street, Belmont, intersection Northbound lane closed to extend and realign right turn and merge lanes | Realign lanes | 7pm-5.30am | | √ | √ | √ | √ |
|
|
North of Hebden Crescent Northbound lane closed to resurface with asphalt | Paving | 8pm-5.30am | | √ | √ | √ | √
|
|
|
SH2/58 Haywards Hill interchange Lane closures for interchange finishing works
| SH2/58 project | 9am-4pm | | | √ | √ | √ | √ |
|
Whakatiki Street intersection Shoulder closed to | Traffic signals | 9am-4.30pm |
|
| √ | √ | √ | √ |
|
Haywards intersection to Te Marua Stop/go at
| Road marking | 7pm-5.30am |
| √ | √ | √ | √ | |
|
State Highway 58
√
√
√
Paremata Road
Ivey Bay to Postgate Drive
Stop/go traffic control to install new stormwater grates and clear debris
East of Postgate Drive, below Bosun Terrace
Stop/go traffic control to reinstate concrete barriers
Maintenance
7pm-5.30am
√
Location |
Type of work |
Hours |
Sun 4 |
Mon 5 |
Tue 6 |
Wed 7 |
Thu 8 |
Fri 9
|
Sat 10 |
Haywards Hill intersection finishing works North of the quarry Stop/go traffic control to install ducts under road Near the electricity sub-station Lane closed to install electronic sign | SH2/58 project | 7pm-5.30am | | √ | √ |