Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 3073

Wellington region maintenance programme

$
0
0

 

 

Information about roadworks in the Wellington and Kāpiti regions

Well-maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thank you for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for Sunday 1811 June - Saturday 24JuneSaturday 17June 2017 as follows. We’ll keep you posted on future works and have regular updates on local radio stations.

NOTE: Roadworks are dependent on weather and other factors. If bad weather should strike, work will be postponed to the next suitable night.

TUNNELS, MONTHLY MAINTENANCE:Link to 2017 calendar

 

Sunday 1811 June - Saturday 2417 June 2017

State Highway 1  

                               

Tunnel

9pm-5.30am

 

 

 

 

 

 

Arras Tunnel

Detour via Cambridge   Terrace while tunnel closed for maintenance

Tunnel

9pm-5.30am

 

 

 

 

 

 

 

 

 

 

Kent   Terrace

Left lane closed to   monitor wastewater and install alarm

Wastewater

7pm-5.30am

 

 

 

 

 

 

Vegetation

9pm-4am

  

 

   

Coast Road

Stop/go northbound   traffic control for footpath repairs

Footpath repair

7pm-5.30am

 

 

 

 

 

 

 

 

Kimberley Road SH1/57 intersection

Lane closed to repair road near intersection

Road repair

7am-4pm

 

 

 

 

 

 

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 1811th    

  
  

Mon 1912th

  
  

Tue 2013th   

  
  

Wed 2114stth       

  
  

Thu 2215ndth   

  
  

Fri 2316rdth       

  
  

Sat 2417th

  

Cobham Drive/Evans Bay Parade intersection

Lane closed for traffic   signalstraffic signals upgrade

Link to information

Traffic signals

7pm-5.30am

 

 

Mt VictoriaThe Terrace Tunnel

DETOUR FOR VEHICLESDetour via other on and  Newtown or harbour baysoff-ramps while tunnel closed for resurfacing near Basin   Reserve traffic signalsmaintenance

Tunnel pathway OPEN for   pedestrians and cyclists

PavingTunnel

9pm-5.30am

 

 

 

 

 

 

 

Urban motorway southbound from Aotea Quay off-ramp–   Murphy Street off-ramps

  •   Monday

DETOUR via other off-rampsAotea Quay   while road repairs underwaybeing resurfaced

  •   Tuesday,   Wednesday, Thursday

Southbound lane closed   for bridge joint works

Link to information

Wellington City CouncilPaving, bridge joints

10pm-5.30am9pm-5.30am

 

 

 

 

 

 

 

Urban motorway above railway yards and Thorndon   Quaynear Tinakori northbound on-ramp

Lane closed to install traffic sensor wires under road surface – north and southboundfor vegetation maintenance

Traffic monitoringVegetation

7pm-5.30am9pm-5.30am

 

 

 

 

 

 

 

Urban motorway from The Terrace to JohnsonvilleMt Victoria Tunnel

LaneDetour via Newtown or harbour bays while tunnel closed to clean   cameras – north and southbound

Traffic monitoring

9am-3.30pm

 

 

 

 

 

  for maintenance

 VivianVivian  Street to Basin Reserve

Stop/go traffic control to paint road markings

Road marking

Various times at night

Churton Park northboundsouthbound on-ramp lamppostlighting installation

  •   Sunday,   Monday, Tuesday

DETOUR via Johnsonvillefor Grenada  or Tawa rampsVillage traffic over Westchester Overbridge while northboundsouthbound on-ramp closed

State highway left-hand   lane closed

  •   Wednesday   and Thursday

On-ramp open

State highway left-hand   lane closed

Link to information

Lighting

9pm-5.30am

 

 

 

Linden, south of Porirua

Lane closed for centre   median construction

Transmission Gully project

7pm-5.30am

   √

 

 

SH1 Mana slip lane to SH58 ParemataWhitford Brown, near northbound off-ramp

Stop/go traffic control to resurface SH58 with asphaltNorthbound lane closed   to repair light

PavingLighting

7pm-5.30am

   √

 

   √

 

 

 

 

 

 

 

 

Mana EsplanadeNorth of Whitford Brown intersection

LaneNorthbound lane closed for road  markingto install stormwater drain

Road markingDrainage

7pm-5.30am5.30am-4pm

 

   √

 

 

Mana EsplanadeParemata Bridge

Southbound lane closedDivert on different  route around roundabouts while lanes closed for service worksresurfacing

Link to information

Wellington WaterPaving

Telecoms

9pm-4pm9.30am-3.30pm

 

 

 

 

   √

 

 

 

Whenua Tapu, north of the Plimmerton weigh   stationMana Esplanade

Lane closed to conduct   practical assessments for traffic control supervisorsroad marking

TrainingRoad marking

7pm-5.30am

 

   √

   √

 

 

 

 

Pukerua Bay north to Coast Road

Stop/go traffic control to install retaining wall

Slip repair

7pm-5.30am

 

 

Stop/go traffic control to remove tree branches near power lines

Kapiti Expressway – Raumati Straight and Peka   PekaPeka Peka

Expect traffic controls at various times for finishing works

Expressway   project

Various times day and night

 

 

      √

Old SH1, Paraparaumu to Levin

Lane closed to maintain   power poles – various locations

Electra

8.30am-4.30pm

 

   √

                              

                       

                                                               

State Highway 2

                                             

 

 

North of Hebden Crescent

Northbound lane closed to resurface with asphalt

Paving

8pm-5.30am

 

 

 

 

 

 

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 1811th    

  
  

Mon 1912th

  
  

Tue 2013th   

  
  

Wed 2114stth       

  
  

Thu 2215ndth   

  
  

Fri 2316rdth       

  
  

Sat 2417th

  

Owen Street, Belmont, intersection

Northbound lane closed toclosed to extend and realign right turn and merge lanes

Link to information

Safety upgrade

7pm-5.30am

   

SH2/58 Haywards Hill interchange

Lane closures for   interchangefor interchange finishing works

Link to information

SH2/58 project

Various times day and night

   √

 

Whakatiki Street intersection, Upper HuttHaywards to Te Marua

DETOUR for northbound  Stop/go traffic turning right at intersection: Follow traffic control instructions to turn at Gibbons Streetcontrol to paint  road markings, various sites

Traffic signalsRoad marking

9pm-5.30amVarious times at night

 

 

 

Upper Hutt, near Topaz Street, BirchvilleWhakatiki Street intersection

Stop/goSouthbound traffic control to clear drainsDETOUR: Follow traffic control instructions for detours while   intersection upgraded with traffic signals

DrainageTraffic signals

9am-4pm9pm-5.30am

 

 

 

 

 

 

Upper Hutt, north of Topaz Street, Birchvillefrom Akatarawa Road intersection to Vista Crescent, Brown Owl

Stop/go traffic control to install new guardrailupgrade footpath, kerb and channel

Barrier renewalRoadside upgrade

7pm-5.30am9am-4pm

 

 

 

Near Kaitoke Loop RoadUpper Hutt, north of Topaz Street, Birchville

Stop/go traffic control for trimming and removal of treescontrol to install new guardrail

Link to information

 Barrier renewal

8am-4pm7pm-5.30am

  

 

 

 

 

Rimutaka Hill Road

Stop/go traffic control to repair guardrails and maintain traffic camerasbarriers

 

Barriers

Traffic monitoring

8am-4pm

 

 

 

 

 

 

                                                                                                        

                                                             

                                     

State Highway 58 

                                       

Paremata Road, Joseph Banks Drive to Postgate Drive

Through traffic please use other routes on Sunday and Monday

DETOUR while road closed for seawall repairs in Duck Creek and Bradeys Bay

 

Stop/go traffic control for seawall repairs

 

9pm-5.30am

 

7pm-5.30am

   √

 

 

 

 

 

 

 

 

Paremata Boating Club to intersection and   roundabout to SH1

Through traffic please use other routes on Sunday and Monday

Stop/go traffic control to resurface SH58 with asphalt

Traffic may at times be sent a different way round the roundabout

Paving

9pm-5.30am

   √

 

 

 

 

 

 

 

 

Paremata Road

Road shoulder closed for water pump maintenance

Wellington Water

 

9am-4pm

 

 

 

 

 

 

  

Location

  
  

Type of work

  
  

Hours

  
  

Sun 1811th    

  
  

Mon 1912th

  
  

Tue 2013th   

  
  

Wed 2114stth       

  
  

Thu 2215ndth   

  
  

Fri 2316rdth       

  
  

Sat 2417th

  

Haywards Hill intersection finishing works

North of the quarry

Stop/go traffic control tocontrol to install ducts under road

Near the electricity sub-station

Lane closed to install   electronic sign

SH2/58 project

7pm-5.30am

 

 

              

                          

                                   

                                      

             

 


Viewing all articles
Browse latest Browse all 3073

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>