Quantcast
Channel: Updates to NZ Transport Agency
Viewing all articles
Browse latest Browse all 3073

Traffic notices

$
0
0

Traffic notice for the week 3023 - 29 June - 6 July 2017

Traffic notices provide a brief overview of likely traffic disruptions for the following week. Full closures are also advertised in the Weekend Herald. Traffic notices are complemented by monthly construction updates and quarterly newsletters.

 

ALREADY IN PLACE

  • Narrowed lanes and 80 km/h speed limit northbound on the motorway between the Papakura Interchange and Hill Road.

  • Narrowed lanes and 80 km/h speed limit southbound on the motorway between Orams Road and the Papakura Interchange.

  • Full closure of Orams Road Bridge to all traffic and pedestrians.

  • Narrowed lanes and 50 km/h speed limit both directions on Great South Road at Takanini Interchange, between the northbound off-ramp and the southbound on-ramp.

 

CLOSURES NEXT WEEK

  Northbound

Southbound

  • Tuesday 4 July - Wednesday 5 July -  Monday 26 June - Night closure of one lane northboundthe full motorway southbound from the PapakuraTakanini Interchange to Papakura Interchange. This includes the Takanini Interchange.
     

Southbound

  • Monday 3 July -  Night closure of the full motorway southbound from the Manakau Interchange to the Takanini Interchange. This includes closure of the Redoubt Road on-ramp, Lambie Drive eastbound on-ramp, and SH20-1 Link.
  • Tuesday 4 July - Wednesday 5 July - Night closure of the full southbound motorway from the Takanini Interchange to Papakura Interchange. This includes closure of the southbound on-ramp at Takanini.
  • Tuesday 4 July - Night closure of two lanes southbound from Hill Road to the Takanini Interchange.

 

Local Roads

  • Sunday 2 July - Night closure of one lane eastbound and two lanes  westbound on Great South Roadsouthbound on-ramp at the Takanini Interchange.Takanini.
  • Monday 3 July - Night closure of two lanes  westbound on Great South Road at the Takanini Interchange.
  • Tuesday 4 July - Thursday 6 July - Night closure of one lane eastbound and two lanes  westbound on Great South Road at the Takanini Interchange.

 

UPCOMING WORKS (dates may be subject to change)

  • Sunday 9 July - Thursday 13 July -Tuesday 27 June - Wednesday 28 June - Night closure of the full southbound motorway northbound from thebetween the Takanini Interchangeoff-ramp to Hill Road. This includes closure of the northbound on-ramp at Takanini.Takanini on-ramp.
  • Sunday 9 July - Thursday 13 July - NightThursday 29 June - Night closure of the full motorway southbound frommotorway  southbound from the Takanini Interchange to the Papakura Interchange. This includes closure of the southboundsouthbound on-ramp at Takanini.

 

Night work on the motorway next week involves bore piling of the additional southbound lane over Great South Road, establishment of a new work zone at the Pahurehure Inlet, and general road maintenance. If it rains or ground conditions are too wet, work will be postponed until the next available dry night.

To construct an additional fourth southbound lane from SH20 to Hill Road, the eastern span of Orams Road Bridge will be lengthened.  While this work takes place, Orams Road Bridge will be temporarily closed to all pedestrians and traffic until October 2017.

Work during the night will allow our crews to operate equipment safely while adjacent to the existing traffic lanes. Work in the shoulder and median work zones will continue during the daytime next week, but this will not affect traffic movements.

With the lanes narrowed, there is less time to react to other vehicles and it is important that motorists keep to the 50-80 km/h speed limits past our work areas. There will be ongoing truck and project vehicle movements accessing the shoulder and median work sites. Keeping both motorists and our team members safe as possible is imperative and we need everyone's help to do this.

As always, we will be doing our best to minimise effects of these works on the public as much as we can.

We thank you for your patience as we work to improve journey reliability and safety along the Southern Corridor.

If you have any questions or queries, please contact our team on free phone 0508 NZTA SCI (0508 698 2724) or email us at southerncorridor@nzta.govt.nz . Also feel free to visit us at the Project Office located at 8 Great South Road, Takanini.

Detour maps

Southbound Takanini Papakura Detour Map

Southbound Manukau Takanini Detour Map

Northbound Takanini Manukau Detour Map

Northbound Papakura Takanini Detour Map


Northbound

  • Thursday 29 June - Night closure of the full northbound motorway from Papakura to Takanini. This includes both northbound on-ramps at Papakura. 

 

  Local Roads 

  • Wednesday 28 June - Thursday 29 June - Night closure of one lane eastbound and one lane westbound on Great South Road at the Takanini Interchange.

  

UPCOMING WORKS (dates may be subject to change)

  •   Monday 3 July - Night closure of the full motorway southbound from the Manakau Interchange to the Takanini Interchange. This includes closure of the Redoubt Road on-ramp, Lambie Drive eastbound on-ramp, and SH20-1 Link.
  •   Tuesday 4 July - Night closure of the full motorway southbound from the Takanini Interchange to Papakura Interchange. This includes the southbound on-ramp at Takanini.

 

Night work on the motorway next week involves vegetation clearance, hydroexcavation and piling works at Takanini, fill placement at Alfriston and general road maintenance. If it rains or ground conditions are too wet, work will be postponed until the next available dry night.

To construct an additional fourth southbound lane from SH20 to Hill Road, the eastern span of Orams Road Bridge will be lengthened.  While this work takes place, Orams Road Bridge will be temporarily closed to all pedestrians and traffic until October 2017.

Work during the night will allow our crews to operate equipment safely while adjacent to the existing traffic lanes. Work in the shoulder and median work zones will continue during the daytime next week, but this will not affect traffic movements.

With the lanes narrowed, there is less time to react to other vehicles and it is important that motorists keep to the 50-80 km/h speed limits past our work areas. There will be ongoing truck and project vehicle movements accessing the shoulder and median work sites. Keeping both motorists and our team members safe as possible is imperative and we need everyone's help to do this.

As always, we will be doing our best to minimise effects of these works on the public as much as we can.

We thank you for your patience as we work to improve journey reliability and safety along the Southern Corridor.

If you have any questions or queries, please contact our team on free phone 0508 NZTA SCI (0508 698 2724) or email us at southerncorridor@nzta.govt.nz . Also feel free to visit us at the Project Office located at 8 Great South Road, Takanini.

Detour maps

Southbound Takanini Papakura Detour Map

Southbound Manukau Takanini Detour Map

Northbound Takanini Manukau Detour Map

Northbound Papakura Takanini Detour Map


Viewing all articles
Browse latest Browse all 3073

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>