This section includes a range of reports that outline the background and previous work undertaken on the improvements around the Basin Reserve. The recent reports prepared as part of the current phase of work are also included.
Information brochures
Proposed layout
Community engagement report
Ngauranga to Airport Governance Group
Displays from public information days
You can download copies of the information panels that are on display at the information centre and open days in the publications section .
Scoping report and technical information
Copies of all technical reports are held at the Information Centre, at the Central, Kilbirnie and Newtown Libraries and are available for download here.
2001 Scheme Assessment Report (2000)
- Interim Scheme Assessment Report
Ngauranga to Airport Strategic Study (2006 - 2008 )
- Problem Framing Report
- Technical Report One: Description of options
- Technical Report Two: Option packages
- Phase II consultation report
- Technical Report Three: Recommended strategy
- Ngauranga to Airport Transport Strategy Lambton Quay Safety Assessment
Interim Reports (2008 – 2009)
- Basin Reserve At-Grade Intersection Proposals
- Basin Reserve Grade Separation Project Feasibility Report
- Summary Report on the Basin Reserve Workshop
- Addendum (Summary Report on the Basin Reserve Workshop)
WellingtonNorthern Corridor Transportation Improvements Around the Basin Reserve (2010 – Present)
- Preliminary Property Assessment Report
- Preliminary Geotechnical Appraisal Report
- Transportation Technical Note
- Scoping Report
- Contents
- Introduction
- National, regional and local policy context
- Developing Wellington city
- Families of options
- Wellington city community
- Description of the existing traffic situation
- Road safety
- Community / social considerations
- Environment / ecology
- Archaeology
- Heritage buildings
- Urban design - part 1
- Urban design - part 2
- Urban design - part 3
- Noise
- Air quality
- Geotechnical considerations
- Physical design considerations
- Appendix A: Wellington city policies and strategies
- Appendix B: Policy related to archaeology
- Appendix C: Air quality
- Appendix D: Building heritage
- Appendix E: Heritage
- Appenidx F: GIS
- War Memorial Tunnel Scoping Report
- Feasible Options Report
- Total corridor transportation technical note
- Preliminary Assessment of Option X
- Draft Scheme Assessment Report (2012) (SAR) on the findings from investigatory and preliminary design work for the Basin Bridge Project. As the electronic file sizes are large, this report is available by e-mailing the project team at basin-bridge@nzta.govt.nz and we will send out a copy on CD-ROM.