Site specific management plans

$
0
0

Site specific management plans (SSMP) outline detailed information about the works being carried out, as well as detailed artist’s visualisations of how each section of road will look once completed.

Note: All SSMPs include information on the shared pathway (cycleway, walkway, bridleway) that will travel the length of the Expressway.

On this page

SSMP 001 - Poplar Avenue interchange and north to Leinster Avenue

This SSMP covers the area of the Expressway including the Poplar Avenue interchange and north to Leinster Avenue.

PlanDownload
Site Specific Management Plan (SSMP) 001PDF
Appendix 1 - Plans and drawingsPart 1PDF
 Part 2PDF
 Part 3PDF
 Part 4PDF
Appendix 2 - Consultation, feedback and responsesPDF
Appendix 3 - Bridge summary: Poplar Ave BridgePDF

Back to top

SSMP002 – Leinster Avenue to the south side of the Wharemauku Bridge

This SSMP covers the area of the Expressway from Leinster Avenue to the south side of the Wharemauku Bridge. It includes a pedestrian/cycle overbridge at Leinster Ave, the Expressway bridge at Raumati Road and a CWB bridge over the Wharemauku Stream. This does not include the Wharemauku Expressway Bridge and associated works which are in the SSMP 3 (area to the north).

PlanDownload
Site Specific Management Plan (SSMP) 002PDF
Appendix 1 - Drawing setPart 1PDF
 Part 2PDF
 Part 3PDF
 Part 4PDF
 Part 5PDF
 Part 6PDF
 Part 7PDF
 Part 8PDF
Appendix 2 - Consultation, feedback and responsesPDF
Appendix 3 - Bridge summary: Raumati BridgePDF
Appendix 4 - Ecological mitigation tablePDF

Back to top

SSMP 003 - Wharemauku Stream to the Kāpiti Road

This SSMP covers the area of the Expressway from the southern side of the Wharemauku Stream to the Kāpiti Road interchange including the on/off ramps (800m north of Kāpiti Road).

PlanDownload
Site Specific Management Plan (SSMP) 003PDF
Appendix 1 - Drawing setPart 1PDF
 Part 2PDF
 Part 3PDF
Appendix 2 - Consultation, feedback and responsesPDF
Appendix 3 - Bridge summary: WharemaukuPDF
Appendix 4 - Bridge summary: KāpitiPDF

Back to top

SSMP 004 - Kāpiti Road to Mazengarb Road Bridge

This SSMP covers the area of the Expressway from north of the Kāpiti Road interchange to the Mazengarb Road Bridge. Makarini footbridge location and detail is not included at this stage; consultation and design to be included at a later stage.

PlanDownload
Site Specific Management Plan (SSMP) 004PDF
Appendix 1 - Drawing setPart 1PDF
 Part 2PDF
 Part 3PDF
 Part 4PDF
 Part 5PDF
 Part 6PDF
Appendix 2 - Consultation, feedback and responsesPDF
Appendix 3 - Bridge summary: Mazengarb BridgePDF

Back to top

SSMP 005 + 006 - Otaihanga North and South

This SSMP covers the area of the Expressway from north of the Mazengarb Road crossing to the south side of the Waikanae River Bridge. It includes the expressway overpass bridge at Otaihanga Road, Otaihanga construction yard and associated construction works within this area. This does not include the Mazengarb Road Bridge, nor the Waikanae River Bridge and associated works which are in the SSMP areas to the north and south.

PlanDownload
Site Specific Management Plan (SSMP) 005 and 006PDF
Appendix 1 - Plans and drawingsPart 1PDF
 Part 2PDF
 Part 3PDF
 Part 4PDF
 Part 5PDF
 Part 6PDF
Appendix 2 to 6 - Citation, feedback, and responses; bridge summary; landscape specifications; ecological mitigation areas; wetland plant salvagePDF

Back to top

SSMP 007 - Waikanae River

This SSMP relates predominantly to the Waikanae River Bridge and associated Expressway construction works, including the Waikanae River, flood plains, Muaupoko Stream, interface with El Rancho, bridge construction yards and storage areas etc.

PlanDownload
Site Specific Management Plan (SSMP) 007PDF
Appendix 1 - Plans and drawingsPart 1PDF
 Part 2PDF
Appendix 2 to 5 - Citation, feedback, and responses; bridge summary; landscape specifications; ecological mitigation areasPDF

Back to top

SSMP 008 - Waikanae River to Te Moana Road

This SSMP covers the area of the Expressway from the north side of the Waikanae River up to the north side of Te Moana Road. It includes the Te Moana interchange, and the on and off ramps, which bridge the Waimeha Stream.

PlanDownload
Site Specific Management Plan (SSMP) 008PDF
Appendix 1 - Drawing setPart 1PDF
 Part 2PDF
 Part 3PDF
Appendix 2 - Consultation, feedback and responsesPDF
Appendix 3 - Bridge summary: Te MoanaPDF
Retaining Wall AddendumPDF

Back to top

SSMP 009: Te Moana Road to Ngarara Road

SSMP 9 covers the Expressway north of Te Moana Road to Ngarara Road; it comprises one sector (Sector 520). This document incorporates two interrelated SSMPs, covering landscape, and the cycle, walking and bridleway (CWB).

PlanDownload
Site Specific Management Plan (SSMP) 009PDF
Appendix 1 to 3 - Drawing set; consultation, feedback, and responses; landscape specificationPDF

Back to top

SSMP 010

Sector 530: Ngarara Road Bridge

This SSMP provides details around the Ngarara Road Bridge.

PlanDownload
Site Specific Management Plan (SSMP) 010 (Sector 530)PDF
Appendix 1 - Drawing setPDF
Appendix 2 - Consultation, feedback and responsesPDF
Appendix 3 - Bridge summary: Ngarara BridgePDF

Sectors 540 & 580: Ngarara Road to Smithfield Road

This SSMP covers the area of the Expressway from north of Ngarara Road, to north of Smithfield Road. This includes includes the new Nga Manu access road and bridge, and the Smithfield Link Road and bridge, as well as the large ecological mitigation area near Nga Manu Nature Reserve.

PlanDownload
Site Specific Management Plan (SSMP) 010 (Sectors 540 & 580)PDF
Appendix 1 - Drawing setPart 1PDF
 Part 2PDF
 Part 3PDF
 Part 4PDF
Appendix 2 - Consultation, feedback and responsesPDF
Appendix 3 - Ecological mitigation tablePDF

Sector 550: Smithfield Road to Paetawa Drain

This SSMP covers the area of the Expressway from north of Smithfield Road to the Paetawa Drain.

PlanDownload
Site Specific Management Plan (SSMP) 010 (Sectors 550)PDF
Appendix 1 - Drawing setPart 1PDF
 Part 2PDF
Appendix 2 - Consultation, feedback and responsesPDF
Appendix 3 - Ecological mitigation tablePDF

Back to top