Auckland overnight motorway closures 15-21 November 2015
For daily updated closure information click here.NORTHERN MOTORWAY (SH1)Greville Road southbound on ramp, 15 NovemberSouthbound lanes between Greville Road off ramp and Upper Harbour Highway on ramp,...
View ArticleManaging maintenance on state highways
There are minimum criteria for condition and availability whenminimum criteria for condition and availability wh en maintaining and operating our network. We contract this to consultants and...
View ArticleHigh speed data collection programmes
Each year, between October and March, we survey the condition of our highways. We do this using a specialist vehicle called ‘SCRIM+’ (Sideway-force Coefficient Routine Investigation Machine). SCRIM+...
View ArticleSouthbound traffic on SH3 to be diverted onto new bridge
The traffic switch is expected to happen on Sunday or Monday, and will enable crews to upgrade the road surface on the southbound lane of the existing highway. The right turn lane to Fitzroy will...
View ArticleTraffic advisory – Bay of Plenty
SH2 Works on Tauranga Eastern Link Toll Road The final asphalt surface will be applied on the 3.5km chip seal section of the Toll Road. Work will take place Monday 16 – Friday 20 November between the...
View ArticleSH2 – Final surfacing for a section of the Tauranga Eastern Link Toll Road
The NZ Transport Agency advises that the last section of the Tauranga Eastern Link (TEL) Toll Road is ready to have the final asphalt surface applied. The work is expected to take place on the 3.5km...
View ArticleWorks continue at Te Atatu interchange
The weekend work means there will be temporary restrictions from 10pm Friday 20 November to 5am Monday 23 November. It follows other restrictions this weekend 10pm Friday 13 November to 5am Monday 16...
View ArticleWellington region maintenance programme
Information about roadworks in the Wellington-Kāpiti regionWell maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we...
View ArticleGlen Murray Bridge (Rangiriri) to be CLOSED for five days
The closure will be in place from 7pm Friday, 20 November until 6am Wednesday 25 November, to allow the contractor to link the Glen Murray Bridge to the new Rangiriri Interchange Bridge. A detour via...
View ArticlePlanning for freight
The cost of moving freight directly impacts on our standard of living.By delivering freight efficiently, the cost of doing business is reduced and can result in cheaper goods for all New Zealanders and...
View ArticleSpecification and guidelines for road lighting design
M30 specificationSpecification and guidelines for road lighting designAccepted luminairesList of M30 accepted luminaires (as at 13 November21 October 2015)M30 luminaire acceptance process (as at 31...
View ArticleOfficial Information Act (OIA) responses
Our recent responses to Official Information Act (OIA) requests from media organisations. Spending on road safety advertisingResponded: 4 September 2015 Requested by: National Business...
View ArticleUpdate on Queenstown’s Shotover Country roundabout on State Highway 6
Whilst some finishing work will be completed in the New Year, the roundabout will be functioning for traffic on the state highway through the busy holiday season. In the meantime, contractors are doing...
View ArticleFunding
Find out how much the Transport Agency and territorial authorities spend on transport including infrastructure, transport planning, road maintenance, walking and cycling, and passenger transport.All...
View ArticleTransport data
The Transport Agency collects transport data from investment partners as well as a range of government and non-government sources. This information, in the form of tables, reports and interactive...
View ArticleRoad safety barrier systems
Road safety barrier systemsSpecifications and notesTitleDateDownloadM23 Road safety barrier systems - specificationsOct 2009 (3 pages | 40KB)M23 Road safety barrier systems - notesOct 2009 (8 pages |...
View ArticlePreferred alignment
Preferred alignment confirmed We are now able to confirm the alignment of the proposed new transport route for the Petone to Grenada Link Road.We can now confirm that the proposed new transport route...
View ArticleFAQs
Preferred alignmentWhat are the benefits of the Petone to Grenada Link Road for the Wellington Region?How will we manage any future increased traffic demand on SH1?What were the options for the north...
View ArticleActivity at Nevis Bluff, SH6, near Queenstown from 23 November
Repair work using abseilers and helicopters will be ongoing for around two weeks, said John Jarvis, Senior Network Manager, NZ Transport Agency. The work is part of on-going safety and monitoring of...
View ArticlePetone to Grenada Link Road one step closer as preferred route confirmed
The proposed project is part of a suite of new roading, cycling and public transport projects being progressed on behalf of the Government throughout the Wellington region to improve economic growth,...
View Article