Wellington region maintenance programme

$
0
0

Information about roadworks in the Wellington-Kāpiti region

Well maintained roads are an important part of keeping people safe.  While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient.  Thanks for your patience and understanding while we do this important work.

Please drive carefully through work sites and stick to the temporary speed limits.  If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.

Below is a quick outline of the major works planned for the coming week.  We’ll keep you posted on future works and have regular updates on local radio stations. 

State Highway 1

Cobham Drive
We’ll be doing resurfacing works at night from 7pm to 5:30am along Cobham Drive in the northbound lanes between Evans Bay Parade and the Calebar Road roundabout. Please allow extra time for your journey.
Resurfacing Tuesday 6th October - Thursday 8th October

Calabar Rd - See map
Cobham Dr - See map
Cobham Dr - See map

State Highway 2

LocationType of workStart date
Rimutaka Hill Road
We’ll be working at a number of sites over the Rimutaka Hill Road during the day but temporary speed restrictions will be in place through work sites both day and night so take extra care.
ResurfacingSunday 27th September to November.
Featherston
We’ll be working opposite the Fell Locomotive Museum through the centre of Featherston (Fitzherbert Street), from 8am to 4pm.
ResurfacingMonday 5th October
Wiltons Road to Norfolk Road
We’ll be working from Wiltons Road to Norfolk Road just south of Masterton to install guardrails from 8am to 4pm during week days.  A temporary speed restriction of 50kph will be in place while work is underway.
Guardrail installationMonday 28th September for 4 weeks. 
LocationType of workStart date

Ruahine Street
We’ll be working from at night 9pm to 5:30am in the area shown in the map, and will tie these works in with one for the Mt Vic Tunnel closures.

Resurfacing

Sunday 4 OctoberThursday 24 September

See map

Pukerua Bay
We’ll be working during week days to repair an underslip at the northern end of Pukerua Bay.   Work will be off the highway but the lookout parking bay will be closed to traffic while work is underway.
Underslip repairMonday 28th September 28 th– late October.

State Highway 2

LocationType of workStart date
Hutt Road North of Charles Street Footbridge
We’ll be working at night from 7pm to 5:30am in the area shown on the map.
Resurfacing

Sunday September 27 th and Monday September 28 th .

See map

Hutt Road Grounsell Crescent to Major Drive
We’ll be working at night from 7pm to 5:30am in the area shown on the map. The northbound on-ramp from Grounsell Crescent will be closed on one of the nights, but there will be signs or a Traffic Controller to show drivers which alternative route to take.
Resurfacing

Tuesday September 29 th and Wednesday September 30 th

See map

Rimutaka Hill Road
We’ll be working at a number of sites over the Rimutaka Hill Road during the day but temporary speed restrictions will be in place through work sites both day and night so take extra care.
ResurfacingSunday September 27 th to Thursday October 1 st .
Featherston
We’ll be working opposite the Fell Locomotive Museum through the centre of Featherston (Fitzherbert Street), from 8am to 4pm.
ResurfacingMonday September 28th.
Wiltons Road to Norfolk Road
We’ll be working from Wiltons Road to Norfolk Road just south of Masterton to install guardrails from 8am to 4pm during week days.  A temporary speed restriction of 50kph will be in place while work is underway.
Guardrail installationMonday September 28th for 4 weeks. 