Information about roadworks in the Wellington-Kāpiti region
Well maintained roads are an important part of keeping people safe. While we aim to do this work with as little disruption as possible, we know that roadworks can be inconvenient. Thanks for your patience and understanding while we do this important work.
Please drive carefully through work sites and stick to the temporary speed limits. If you’re driving around the Wellington region, roadworks on the state highway network may affect your travel plans.
Below is a quick outline of the major works planned for the coming week. We’ll keep you posted on future works and have regular updates on local radio stations.
State Highway 1
Tree felling
16 March
Manakau
Crews are tree felling on Thursday during the day by the rail overbridge. Traffic will be controlled by stop/go.
Tree felling
217 March
Location | Type of work | Start date |
---|---|---|
Cobham Drive | Gardening | 22 |
Johnsonville Off Ramp | Crash barrier repairs | 22 March |
State Highway 2
Please allow extra time for your journey if you are travelling through the Wairarapa over the coming weeks, as there are multiple work sites. Keep to the temporary speed limit for your safety and the safety of our work crews. Allow plenty of room between you and the vehicle in front to minimize the risk of damage to your windscreen and paintwork.
South of Rimutaka Bridge number 4
Crews will be resurfacing the road with chipseal during the day from Monday.
NOTE: If bad weather should strike, work will be postponed to the next suitable night.
Updated: 21 March 2016
Gibbons Street, Upper Hutt
Crews are resurfacing on Thursday night.
Resurfacing
17 March
Rimutaka Hill
Crews will be clearing drainage channels on Tuesday during the day.
Drainage works
15 March
Kaitoke
Crews are working during the day starting Monday to resurface the road with chip seal. Traffic will be controlled by stop/go.
Chipsealing
14 March
South of Gilbert Street
Crews are resurfacing the road with chip seal Monday to Wednesday during the day. Traffic will be controlled by stop/go.
South of Gilbert Street
Crews are resurfacing the road with chip seal Monday to Wednesday during the day. Traffic will be controlled by stop/go.
14 March
South of Rimutaka Bridge number 4
Crews will be resurfacing the road with chipseal during the day from Monday.
South of Topaz Street intersection
Crews are resurfacing at night time but a temporary speed limit will be in place 24/7 while the new road surface beds in.
NOTE: If bad weather should strike, work will be postponed to the next suitable night.
Updated: 11 March 2016
Location | Type of work | Start date |
---|---|---|
Ngauranga to Petone | Resurfacing | 20 and 21 March |
Rimutaka Hill Road | Drainage clearing | 22 March |
Rimutaka HillRoad | Guard rail repairs |
|